So..... the Painter have almost finished....they are just completing the bathrooms...and some door frames....then I guess a little more painting outside...
The Tiler has finished..... and now we are just waiting on the shower screens and accessories....
The Plumber needs to return and connect everything up...
The Electrician needs to do the same...
The paths and driveway will hopefully be poured soon...
The roller doors have been ordered ....
Tank has been ordered.....but still hasn't arrived....luckily it hasn't rained...so we haven't missed anything.
The builders put in the Air conditioner dropper....and Ian and Brent have the Air Con on the roof...ducting in the ceiling....and at some stage need to install all the outlets....
...anyway....photos are..... the kitchen looking from the end of the family room.....I cant wait for the plastic drop sheets to come down....and for the range hood to be istalled....