... oh...actually there are a few differences....the back fence is up.... and looking very spiffy....which means the porta loo is now sitting on our block instead of the neighbors.....and our power is now connected (or at least we think it is...Pat phoned to check some details as it was being connected)....and we think that our septic tank is sitting there ready to go in.... so thats progress!!
It was funny....the first time we showed Ian's Mum and Dad the slab and its pouring rain.....the only rain we have in months and we had to cut short our tour as we were getting drenched.....but thats ok.



Just for the record...
Shed is arriving either Wed or Fri next week...
Air Conditioner is ordered...deposit paid
Blinds for all the windows are paid and sitting in our family room...
Have a great weekend...